I-83 East Shore Section 1 Project Portal

PennDOT Plans Improvements to Section of I-83

As part of the nationwide economic stimulus program, PennDOT is planning to resurface a two-mile section of I-83 from the Union Deposit Interchange to the I-81 Interchange.  The work will consist of milling and resurfacing the northbound and southbound lanes of I-83 to improve the ride quality.
 
The I-83 resurfacing project will also include safety improvements at the Colonial Park Interchange with U.S. 22 (Jonestown Road), which were identified as an early-action goal during the preparation of the 2003 I-83 planning study, the I-83 Master Plan.  To eliminate the existing vehicle conflicts along I-83 southbound, the loop ramp from southbound I-83 to eastbound U.S. 22 will be removed.  The traffic to U.S. 22 eastbound will use the same ramp as the U.S. 22 westbound traffic, through a new signalized intersection on U.S. 22 near the Zimmerman Auer Funeral Home.

The project is expected to start before Labor Day 2009 and be completed in 2010.

Main Home
Project Home
Resurfacing Project(New)
Project Schedule
Events
Links
Contact List Sign-up
Contact Us